Trade quote
Tell us what you need and we'll come back with a quote.
Share your quantity and project details for a tailored quote.
Step 1: Quick quote
Step 2: Business and delivery details
Mapegrout Fast-Set Rapido is a fibre-reinforced, R3-class structural mortar engineered for rapid concrete restoration and structural remediation of load-bearing elements like beams and pillars. This thixotropic formula allows for 25mm vertical lifts without slump, reaching a compressive strength of >10 MPa within 3 hours to minimize facility downtime and return floors to service within a single shift.
Compliant with EN 1504-3, it provides permanent adhesion to mechanically roughened substrates and total moisture protection to prevent further rebar oxidation. Specialists must avoid re-tempering the mix after the 10-minute pot life to prevent structural delamination and must maintain a 24-hour damp-curing protocol to eliminate the risk of shrinkage cracks or dusting.
Working time (pot life) is approximately 10 minutes at 20 °C. The product sets in <30 minutes. Plan mixing in small batches and place immediately. Warmer weather shortens these times; cooler weather extends them. Do not attempt to re-temper by adding water once setting has begun.
Thanks to its thixotropic formulation, apply 20–25 mm per layer on vertical/overhead substrates without slump. For deeper rebuilds, apply multiple lifts at roughly 15-minute intervals. Scratch or key each fresh layer to enhance inter-coat adhesion.
Under typical conditions (20 °C), patches are ready for light traffic in ~3 hours once compressive strength exceeds 10 MPa. Protect from rapid moisture loss during early cure and avoid premature loading in cold conditions.
Yes—on dry or highly absorbent substrates, saturate the surface (SSD) and brush on a bonding slurry of 1 part powder to 0.24–0.25 parts water. Place the mortar onto the fresh slurry for optimal bond strength and reduced suction.
No. For precision anchoring, use a dedicated grout such as Mapefill or Mapefill R. For spray-applied mortar repairs, use Mapegrout Thixotropic. Mapegrout Fast-Set Rapido is intended for trowelled placement.
Not recommended. The mortar may change colour after hardening and is not intended as a final architectural finish. Where a protective or decorative finish is required, over-coat with the Elastocolor system after approximately 3 days at 20 °C.
| Application / Use Case | Key Benefit | Primary Trades |
|---|---|---|
| Patching spalled concrete on beams, pillars & balconies | Rapid structural reinstatement; >10 MPa in ~3 hrs; thixotropic non-slump placement | Builders, Remedial Contractors |
| Industrial floor repairs & edge rebuilds | Fast return-to-service; dense, wear-resistant finish with steel float | Builders, Flooring/Remedial |
| Smoothing surface defects (honeycombing, voids, tie-holes) | Uniform, coat-ready substrate; excellent adhesion to old concrete | Builders, Tilers, Remedial |
| Sealing surface cracks in concrete/renders | Low capillary absorption; durable crack fill compatible with coatings | Builders, Remedial |
| Assembly & repair of concrete pipes | High early strength and water impermeability for serviceability | Civil/Plumbers, Builders |
| Pointing between bricks before waterproofing (e.g., Planiseal) | Improves watertightness and coating coverage; rapid turnaround | Tilers, Waterproofers, Builders |
Remove unsound concrete and contaminants to expose sound aggregate. Achieve a rough, open surface (≈ ≥5 mm amplitude). Clean reinforcement to bright metal where exposed, then coat with anti-corrosion protection.
Hydro-scarify, grind, or chip back to sound concrete; square patch edges to improve load transfer.
Abrasive blast rebars; apply Mapefer or Mapefer 1K as directed prior to patching.
Bring substrate to SSD, then apply a bonding slurry to high-suction areas immediately prior to placement.
Blend 1 part powder : 0.24–0.25 parts water to a brushable consistency; scrub into the surface.
Place the repair mortar while the slurry remains fresh to maximise adhesion.
Using a clean pail, add water then powder and mix mechanically to a lump-free, thixotropic mortar.
Per 25 kg bag use 3.75–4.0 L water (≈15–16%). Mix 2–3 minutes with a low-speed paddle.
Mix only what you can place within ~10 minutes at 20 °C. Do not add water once setting begins.
Trowel mortar firmly into the cavity, compacting to remove air and ensure full contact with edges and steel.
Apply up to 20–25 mm per lift on vertical/overhead surfaces without slump.
For deeper repairs, apply subsequent lifts at ~15 minutes intervals; lightly notch or key for adhesion.
On SSD substrate with fresh slurry, spread and compact the mortar; steel-float to finish and feather as required.
Patch boundaries should be cut square; avoid feathering onto weak or dusty material.
Observe minimum thickness that ensures durability; for thin film cosmetic smoothing, consider multiple light passes.
After finishing, protect from rapid evaporation with polyethylene sheets or wet coverings. Clean tools with water before the product hardens.
Maintain moisture for at least the first 24 hours on structural patches to enhance durability.
Apply Elastocolor coatings after approximately 3 days at 20 °C. Remove residues mechanically after set.
Wear chemical-resistant gloves, safety glasses, long sleeves and pants. When mixing/pouring powder, use a P2 (or N95) dust mask/respirator to avoid inhalation of cementitious dust.
Mix and apply in well-ventilated areas. Avoid creating airborne dust. Use local extraction where feasible.
Non-combustible cementitious material. Store dry in original, closed bags. Keep away from moisture ingress and incompatible chemicals.
Refer to the current Safety Data Sheet (SDS) for full health and safety information. Seek medical attention immediately for serious exposure.
Mechanically remove all deteriorated or contaminated concrete to sound substrate with a rough, open texture (target irregularities ≥ 5 mm). Clean of dust, laitance, oil/grease, coatings and weak repairs. Achieve SSD (saturated surface-dry) before placing.
Brush a slurry of 1 : 0.24–0.25 (powder : water) onto SSD concrete and place mortar wet-on-wet.
Bonding Slurry (Mapegrout Fast-Set Rapido + water)Abrasive blast to bright metal to remove rust, scale, contaminants. Ensure clean steel and adequate cover in the repair design.
Coat prepared reinforcement prior to patching to inhibit further corrosion.
Mapefer or Mapefer 1KRemove loose/damaged concrete. Chisel patch edges square and provide minimum depth for interlock. Clean thoroughly; bring to SSD.
Brush on slurry (1 : 0.24–0.25) to control suction; place mortar immediately and steel-float to finish.
Bonding Slurry (Mapegrout Fast-Set Rapido + water)Clean mating surfaces; roughen glossy/latanced areas. SSD condition prior to placement.
Use bonding slurry where high suction or difficult adhesion is expected.
Bonding Slurry (optional)Rake out weak material; clean dust/debris. Dampen to SSD to avoid rapid water loss. Fill joints and defects flush.
Allow initial hardening before subsequent waterproofing (e.g., Planiseal systems) as per system instructions.
—