Trade enquiry
Request custom pricing for larger orders.
Tell us your quantity, timing, and business requirements for a tailored trade price.
Fast trade quote support for larger orders.
When time kills your margin, Mapecem Pronto gives you predictable performance that keeps the job moving. This pre-blended, controlled-shrinkage screed mortar is built for fast-track installations—foot traffic in 2–3 hours and ready for most floor coverings in just 24 hours. That means you can install ceramic and stone the same day and return the next day to lay timber or resilient finishes without chasing moisture issues.
Because it’s factory blended, you eliminate batching errors and get consistent strength and drying every time. No guesswork, no rework. With high compressive strength (over 40 MPa in 24 hours), it stands up to heavy-duty environments like hospitals and supermarkets while maintaining dimensional stability. It’s job-site ready—just add water, mix, place, and move on with confidence.
Potential Outcome: Weak screed, extended drying time, and potential failure under load.
Adheseal Best Practice: Stick to 1.5–1.7 L per 20 kg bag—this keeps strength and drying on spec. No rework, no delays.
Potential Outcome: Loss of workability and poor bonding between layers.
Adheseal Best Practice: Place within 20–30 minutes of mixing. You’ll get a tight, uniform screed that holds first time.
Waiting days for screeds to dry slows down installation and risks missed deadlines, especially on commercial jobs.
Use Mapecem Pronto to install ceramic tiles within 3–4 hours. Its rapid drying and low moisture content let you proceed without delays or substrate failures. Success means faster installs and zero doubt in substrate readiness.
Keep water ratios tight and place immediately—this ensures full strength and avoids weak spots under tiles.
Downtime in retail or healthcare environments costs money and disrupts operations.
Mapecem Pronto delivers fast strength gain and durability for continuous traffic zones. Repairs can be completed and reopened quickly. Success means reduced downtime and protected margins.
Use reinforcement for thicker sections and follow AS 3958.1 guidelines to maximise durability.
Mapecem Pronto dries fast enough for floor installation within 24 hours. You can lay tiles in 3–4 hours and timber or vinyl after 24 hours, keeping projects on schedule with predictable performance.
Mapecem Pronto meets EN 13813 classification CT-C60-F10-A1FL. This confirms high compressive strength and fire performance, giving specifiers and contractors confidence in structural reliability.
Mapecem Pronto is suitable for bonded, unbonded, and floating screeds. This flexibility allows use across new builds, renovations, and heated systems without changing materials.
| Application / Use Case | Key Benefit | Primary Trades |
|---|---|---|
| Fast-track bonded, unbonded, and floating screeds | Ready for light foot traffic in 2–3 hours and ready for use in 24 hours, so you keep the program moving with predictable performance. | Builders, tilers, flooring contractors |
| Ceramic and natural stone installations | Allows tile and stone installation after 3–4 hours, helping you finish first-time-right without long drying delays. | Tilers, builders |
| Timber, PVC, linoleum, carpet, and moisture-sensitive floor coverings | Residual moisture below 2% after 24 hours reduces flooring failure risk and helps avoid no costly callbacks. | Flooring contractors, builders |
| Repairs in continuous-traffic areas such as hospitals, supermarkets, and airports | High early strength and rapid drying cut downtime, protect margins, and get critical spaces back in service faster. | Builders, remedial contractors, commercial flooring crews |
| Screeds incorporating underfloor heating systems | Suitable for heated screeds without added plasticisers, giving a simpler, job-site ready system with reliable performance. | Builders, screeders, flooring installers |
| Projects where batching consistency matters | Pre-blended formulation removes aggregate and binder guesswork, delivering consistent strength, drying, and a cleaner handover. | All trades, owner-operators |
Mix 20 kg with 1.5–1.7 L water for 3–4 minutes.
Place, compact, and float immediately to achieve a smooth surface.
Wear gloves, eye protection, and dust mask when handling powder.
Use in well-ventilated areas to minimise dust exposure.
Ensure substrate is clean, dry, and free from oil, grease, dust, or loose material. Existing joints must be carried through the screed.
Use bonding slurry such as Planicrete SP and apply fresh-on-fresh for optimal adhesion.
Planicrete SP