Duram 195 is a single-pack, liquid-applied, moisture-curing polyurethane membrane that cures to a tough, seamless, elastomeric film. It’s engineered for long-term waterproofing in non-UV-exposed applications and can be used externally when top-coated with Multithane ATC. The formulation (low VOC, bitumen-free) resists re-emulsification, provides excellent chemical and hydrostatic resistance, and is suitable for permanent immersion scenarios. It bonds to a wide array of suitably primed substrates and achieves Class III extensibility for reliable crack accommodation.
For Australian external above-ground use, Duram 195 meets AS 4654.1:2012 (when exposed areas are protected with Multithane ATC) and aligns with Green Star environmental criteria. Typical dry film builds are 1.5 mm DFT on floors/tanking and ~1.0 mm DFT on verticals, applied in two coats at prescribed coverage rates.
Potential Outcome: Gassing/bubbling, poor adhesion, and film defects that compromise waterproofing.
Adheseal Best Practice: Verify substrate dryness. Where entrapped moisture is possible, prime with two coats of Primeseal MC and re-test before membrane application.
Potential Outcome: Aromatic PU slowly degrades under UV, reducing service life.
Adheseal Best Practice: In exposed areas, overcoat with Multithane ATC after Duram 195 cures to ensure UV stability and long-term durability.
Conforming to AS 4654.1 above-ground waterproofing while managing movement and UV exposure on trafficked podiums and balconies.
Prime per substrate; apply Duram 195 to 1.5 mm DFT (floors). In exposed areas, specify Multithane ATC. For tiling, top with screed and install movement joints to AS 3958.1.
Detail corners and joints with Resiflex FC and, where needed, Leak-Seal Tape before field coats to control stress and prevent failures.
Delivering a robust Class III membrane under screeds and tiles without staining or re-emulsification.
Prime appropriately (e.g., Primeseal MC/SP); apply two coats to achieve ~1.5 mm DFT on floors. Top with sand/cement screed; use movement joints as per AS 3958.1.
Observe recoat windows (6–24 h). If exceeded, re-prime to maintain inter-coat adhesion before proceeding.
Managing hydrostatic pressure and protecting the membrane during backfilling and landscaping.
Achieve specified DFT with Duram 195; protect with geotextile/drainage cell before clean fill. Use Primeseal MC where moisture risk exists to prevent gassing.
Rebate wastes and seal perimeters with Resiflex FC; incorporate Leak-Seal Tape over live cracks and joints before field coats.
Yes, with a topcoat. Duram 195 must be over-coated with Multithane ATC for UV exposure. Without the aliphatic topcoat, the aromatic PU will slowly degrade in sunlight, reducing service life.
Floors/tanking typically require ~1.5 mm DFT (two coats at ~0.75 L/m² per coat; total ~1.5 L/m²). Vertical surfaces are typically ~1.0 mm DFT. Always verify coverage against substrate porosity and site conditions.
Direct tile adhesion is not advised. Best practice is to top with a sand/cement screed (with appropriate bonding agents if required) and provide movement joints in accordance with AS 3958.1.
Indicative guide: Touch dry ~4–6 h, recoat 6–24 h, and full cure ~48 h+. Conditions such as temperature, humidity, substrate and ventilation will affect actual times.
Application / Use Case | Key Benefit | Primary Trades |
---|---|---|
Wet areas (floors & upturns) | Seamless Class III film under screeds/tiles; no re-emulsification | Tilers, Waterproofers |
Balconies, decks, terraces, podiums | AS 4654.1 compliance when top-coated; durable movement accommodation | Waterproofers, Builders |
Planters, retaining walls, landscaped areas | Hydrostatic resistance; robust under protection/drainage layers | Remedial, Waterproofers |
Pits, bunding, water-retaining structures | Suitable for immersion; chemical resistance for demanding sites | Remedial, Asset Maintenance |
Roofs & gutters (with ATC topcoat) | UV-stable system using aliphatic Multithane ATC over Duram 195 | Waterproofers, Builders |
Ensure substrates are sound, dry and clean. Repair blowholes/defects with Resiflex FC; allow to cure. Rebate wastes and seal perimeters.
If moisture risk exists, specify two coats of Primeseal MC before membrane to prevent gassing.
Seal cracks/joints with Resiflex FC; reinforce with Leak-Seal Tape where live movement is expected.
Apply by brush, roller, broom or squeegee in two coats to achieve target DFT.
~1.5 L/m² total; aim for ~1.5 mm DFT (each coat ~0.5 mm dry).
Typically ~1.0 mm DFT (as specified); water-resistant non-tanking walls minimum ~0.75 L/m² at ~0.5 mm DFT.
In exposed exterior areas, over-coat Duram 195 with Multithane ATC (~3–4 m²/L). For tiling, top with sand/cement screed and provide joints to AS 3958.1.
Roofs/podiums: protection sheeting, geotextile/drainage cell before ballast/pebbles. Ground works: protection and drainage layers before backfill.
Only with Duram Solvent, max ~1 L per 15 L pail; consult technical advice. Do not use alternative solvents.
Wear chemical-resistant gloves, eye protection and suitable protective clothing. Avoid skin and eye contact with uncured product.
Use in well-ventilated areas. Manage vapours appropriately, especially indoors or in confined spaces.
Solvent-based and combustible when uncured. Keep away from ignition sources. Store cool and dry, away from heat and flames.
Seek medical attention immediately in all cases of serious exposure.
Ensure sound, dry, clean and free from laitance, dust, curing compounds and contaminants. Rectify blowholes/defects with Resiflex FC or non-shrink mortar; allow to cure.
Use Primeseal MC (risk of moisture) or Primeseal SP per TDS. Two coats of Primeseal MC where entrapped moisture is possible.
Duram Primeseal MC / Primeseal SPClean and dry. Treat joints: seal with Resiflex FC; reinforce live cracks/joints with Leak-Seal Tape before field coats.
Prime per TDS. Additional priming may be required on porous or dusty substrates.
Duram Primeseal MC / Primeseal SPRemove rust and contaminants; apply rust converter if required before priming.
Use ME Primer; alternative Primeseal MC where specified.
Duram ME Primer / Primeseal MCClean, dry and secure. Butter edges or seal joints with Resiflex FC; allow to cure. Reinforce with Leak-Seal Tape where movement is expected.
Prime with Primeseal MC (timber/ply/particleboard) per TDS before membrane application.
Duram Primeseal MCRebate floor wastes; seal perimeters with Resiflex FC. Ensure components are securely fixed.
Prime plastics with Superprime 711 where required. Some retrofitted flanges may not need priming—seek technical guidance.
Duram Superprime 711