It is designed for precast panels, anchor bolts, core holes, blockwork core filling, base infills, cavities, and underpinning:contentReference[oaicite:6]{index=6}.
Per 20 kg bag: • Dry pack: 2.7–2.9 L • Trowellable: 3.0–3.4 L • Flowable: 3.6–4.0 L:contentReference[oaicite:7]{index=7}.
>20 MPa (1 day), >40 MPa (7 days), >55 MPa (28 days):contentReference[oaicite:8]{index=8}.
Clean and sound substrates, free of contaminants. Pre-soak for 4 hours before grouting, remove all free water, and ensure formwork is leakproof:contentReference[oaicite:9]{index=9}.
Application / Use Case | Key Benefit | Primary Trades |
---|---|---|
Precast panel base grouting | Reliable non-shrink fill, void-free support up to 150 mm | Precast Installers, Builders |
Anchor bolts & core holes | Strong adhesion, shrinkage-compensated, easy placement | Builders, Engineers |
Blockwork core filling | Pumpable grout for efficient cavity filling | Blocklayers, Concreters |
Underpinning works | High compressive strength, durable long-term stability | Remedial Contractors, Structural Engineers |
Cavities, gaps, and base infills | Flexible placement: dry pack, trowellable, or flowable | Builders, Civil Contractors |
Clean substrate, pre-soak for 4 h, and remove free water. Construct leakproof formwork using foam strips or polyurethane/silicone sealant. Provide vent/bleed holes for confined base plate grouting:contentReference[oaicite:4]{index=4}.
Add grout powder to pre-measured clean water. Mix mechanically (3–5 min) until homogeneous. Do not mix by hand. • Dry pack: 2.7–2.9 L water • Trowellable: 3.0–3.4 L • Flowable: 3.6–4.0 L:contentReference[oaicite:5]{index=5}.
Options: • Dry pack: tamp into position with rods. • Gravity flow: pour from one side using header box, maintaining grout head. • Pumping: use positive displacement pump, pumping bottom-up to avoid voids:contentReference[oaicite:6]{index=6}.
Immediately protect exposed grout. Cover with wet hessian, plastic, or curing compounds (e.g., Curecon). Proper curing is critical to achieve designed strength:contentReference[oaicite:7]{index=7}.
Surfaces must be clean, sound, and free of dust, oil, grease, curing compounds, or contaminants. Mechanically clean if necessary. Pre-soak with water for ≥4 hours before grouting and remove free water immediately prior to placement:contentReference[oaicite:1]{index=1}.
Ensure surfaces are in a saturated-surface-dry (SSD) condition. No puddles of water should remain.
Holes must be clean and free of water. Pre-soak surrounding substrate, then remove excess moisture. Place grout from one side to avoid entrapped air:contentReference[oaicite:2]{index=2}.
Remove debris and contaminants. Saturate porous blockwork or soil-contact areas before placing grout. Maintain formwork watertight for underpinning:contentReference[oaicite:3]{index=3}.