Price Per Unit: $4.58
Price Per Box: $4.12
High-velocity duct system leaking at mechanical joints, reducing efficiency and triggering inspections.
HV Duct created a flexible, airtight seal over each joint, restoring system integrity and meeting compliance.
Use a brush to apply a consistent layer over seams, allow 24 hours to dry before system pressure-up.
HV Duct adheres to galvanised steel, aluminium, fibreglass, and other common duct substrates. It’s ideal for both rigid and flexible ducting.
Yes. Once fully cured, HV Duct is UV- and weather-resistant, making it suitable for external use.
Drying time is typically 24 hours, depending on humidity and application thickness. Full cure may take up to 72 hours.
Yes. HV Duct dries to a paintable surface and can be coated with most water-based paints once cured.
Yes. HV Duct is a water-based, low-VOC formulation and is safe for use in occupied buildings and enclosed spaces.
Application / Use Case | Key Benefit | Primary Trades |
---|---|---|
Sealing sheet metal HVAC duct joints | Maintains airtightness and pressure efficiency in high-velocity systems | HVAC Installers, Mechanical Contractors |
Jointing insulated duct board systems | Flexible seal adapts to movement and thermal expansion | Air Conditioning Technicians |
Sealing around duct penetrations through masonry or plasterboard | Improves fire barrier and air-tight performance | Builders, Commercial Fit-Out Teams |
Preventing dust and air leakage in return air systems | Improves indoor air quality and energy efficiency | HVAC Maintenance Teams, Facility Managers |
DIY HVAC duct repairs | Easy application with brush or cartridge, low odour | Homeowners, DIY Enthusiasts |
Ensure all surfaces are clean, dry, and free from oil, dust, and rust. Light abrasion may help adhesion on smooth or painted surfaces.
Cut nozzle at an angle to match desired bead width. Load cartridge into a standard caulking gun or use a brush application directly from tub.
Apply a uniform bead of HV Duct to all seams and joints. Use a brush to spread the sealant evenly if required.
Tool the bead with a spatula or brush to ensure full contact and a neat finish. Avoid overworking the sealant.
Allow to dry for 24 hours before pressure testing or exposing to external weather. Full cure is typically achieved within 72 hours depending on conditions.
Clean tools and excess product with water while still wet. Once cured, mechanical removal is required.
Wear gloves and protective clothing to prevent skin contact. Safety glasses recommended during overhead or brush application.
Ensure adequate ventilation during application, especially in enclosed duct spaces.
Store in a cool, dry area between 5°C and 30°C. Keep containers sealed when not in use. Dispose of product and container in accordance with local regulations.
Refer to the Safety Data Sheet (SDS) for HV Duct for full safety details.
Wipe clean with a solvent cloth to remove oil and dust. Light abrasion may improve adhesion on smooth surfaces.
Remove loose fibres and dust. Ensure the surface is stable and not shedding. Test adhesion on highly textured areas.
Clean with alcohol-based cleaner. Lightly sand glossy surfaces before application.
Remove dust and debris using a stiff brush or vacuum. Surface must be dry before application.