Price Per Unit: $10.90
Price Per Box: $9.81
Potential Outcome: Restricted movement causes cohesive/adhesive failure or substrate stress.
Adheseal Best Practice: Use correct backer rod or bond-breaker tape to ensure two-sided adhesion per joint design guidance.
Potential Outcome: Poor adhesion and bubbling; premature failure.
Adheseal Best Practice: Clean using the two-wipe method with suitable solvent; ensure substrates are dry and concrete is cured (≥28 days) before application.
Movement and thermal cycling on exposed panels demand a flexible, UV-stable sealant that tools cleanly and stays put without primer delays.
Design joints at ~2:1 (width:depth). For 20 mm width, target ~10 mm depth with backer rod. Gun Hi-Flex Construction + and tool within 10–15 min for a smooth, elastic finish rated to ±50% movement.
Mask edges for crisp lines and remove tape before skin forms. Avoid trapping air while filling—continuous, steady bead prevents bubbles.
Modern facades require primerless bonding to powder-coated aluminium and glass with reliable UV stability and neat, low-mess presentation.
Lightly abrade non-porous frames, clean with appropriate surface prep, then apply a continuous bead and tool off for a weather-tight, non-staining seal that can be painted if required (test compatibility).
Maintain two-sided adhesion around frames by using bond-breaker tape on flat interfaces to allow thermal movement without stress.
Need a clean, non-corrosive adhesive/sealant to bond dissimilar materials and manage differential movement with minimal rework.
Apply a triangular bead (nozzle cut at 90° then wedged) and compress parts to ≥2 mm final bond line. The low-modulus, high-elongation hybrid manages thermal mismatch without print-through.
For critical bonds, pre-treat metals and plastics as directed and verify adhesion with site pull tests before production runs.
Usually no—Hi-Flex Construction + achieves strong primerless adhesion on many non-porous substrates. For critical or high-exposure applications, light abrasion and surface prep are recommended, with adhesion testing prior to installation.
Aim for a ~2:1 width:depth ratio. Internal joints min 5 mm width/depth; external joints min 12 mm width. Use backer rod for joints >10 mm deep and avoid three-sided adhesion with bond-breaker tape.
Application / Use Case | Key Benefit | Primary Trades |
---|---|---|
Perimeter sealing of windows | Primerless adhesion, clean tooling, UV stability | Glaziers, Builders |
Curtain walls & facade panels | Low modulus manages thermal movement | Glaziers, Facade Contractors |
Precast / tilt-up expansion joints | ±50% movement; durable weather seal | Builders |